Office Container – OC208

Large Multi-Office Administration & Management Building – OC208

OC208 is a large single-storey modular administration and management building manufactured by Prefabex for major project teams that require multiple private offices, executive space and shared facilities within one coordinated workplace.

The illustrated configuration measures approximately 16.80 × 13.80 m and combines around 11 private office rooms, a large executive and meeting area, central internal circulation and integrated sanitary facilities.

OC208 is particularly suitable for major construction, EPC, industrial, infrastructure, mining and energy projects where several technical and administrative departments need to operate from the same site headquarters.

OC208 is part of the Office Containers range by Prefabex, developed for project management, engineering, administration and large multidisciplinary site teams.

OFFER REQUEST FROM
(Office Container – OC208)











 

Large Modular Administration Building for Multi-Department Teams

OC208 is designed as a complete project-administration facility rather than a collection of individual standalone office containers.

Private offices are arranged along both sides of a central corridor, allowing individual departments and senior personnel to work independently while remaining connected within the same building.

Approximately 11 Private Office Rooms

The illustrated OC208 floor plan contains approximately 11 individual office rooms of different sizes.

These rooms can be allocated to project management, engineering, planning, procurement, HSE, quality control, document control, administration, site supervision and other departments according to the structure of the project team.

Different office sizes allow some rooms to function as individual offices, while others can accommodate senior personnel or small departmental teams.

Executive Management & Meeting Area

A larger area within the OC208 layout is dedicated to management and formal meeting functions.

This space can be arranged with a management workstation, visitor seating, a conference table and additional furniture for client meetings, senior-management discussions and internal project coordination.

Presentation screens, video-conferencing equipment, additional data connections and alternative furniture layouts can be incorporated according to project requirements.

Central Internal Corridor

A central internal corridor connects the private offices, sanitary block and executive management area throughout the building.

This provides clear circulation and allows personnel and visitors to reach individual rooms without passing through other workspaces.

Enclosed circulation also provides protected movement between departments in hot, cold or demanding project environments.

Central Shared Sanitary Block

OC208 incorporates a centralized sanitary area designed to serve the building's office population.

The illustrated configuration includes multiple WC compartments and washbasins located close to the central circulation area.

Fixture quantities and sanitary layouts can be adapted according to expected occupancy, local requirements and project specifications.

Building Configuration

Model OC208
Product Type Large modular administration and management building
Overall Dimensions Approximately 16.80 × 13.80 m
Building Configuration Single storey
Private Offices Approximately 11 rooms in the illustrated layout
Management Facilities Large executive / meeting area
Circulation Central internal corridor
Sanitary Facilities Central shared sanitary block

Designed for Multi-Department Project Teams

OC208 is particularly suitable for projects where several technical and administrative departments require dedicated rooms within one centralized office building.

Project management, engineering, planning, procurement, administration, quality and safety teams can operate from separate offices while remaining connected through the same internal circulation system.

This arrangement helps improve communication between departments while maintaining the privacy required for senior management and specialized project functions.

Suitable for EPC & Main Contractor Headquarters

Major EPC and construction projects often require a centralized administration building capable of supporting both senior management and multiple technical departments.

OC208 can function as a site headquarters for main contractors, EPC companies, engineering organizations or project-management teams throughout the construction period.

Internal room assignments can be changed during different project phases as departmental requirements evolve.

Purpose-Built Modular Office Construction

OC208 is manufactured as a purpose-built modular office building rather than a converted shipping container.

This allows the structural grid, room dimensions, internal circulation, windows, doors and service routes to be designed specifically for office and administration use.

Depending on the selected project specification, construction can include a galvanized steel structural frame, insulated sandwich-panel walls and roof, durable flooring, insulated doors and windows and complete internal finishes.

Thermal Insulation & Climate Adaptation

Wall and roof systems can be selected according to the environmental conditions at the project destination.

Insulated sandwich panels can use EPS, polyurethane or rock wool cores depending on thermal, acoustic, fire-performance and project requirements.

Windows, external doors and HVAC systems can also be adapted according to the project climate and required level of workplace comfort.

Electrical, Data & Communication Infrastructure

OC208 can be supplied with electrical and data infrastructure integrated during factory production.

Typical systems can include lighting, power outlets, distribution boards, workstation connections and provisions for computers, printers and communication equipment.

Network cabling, internet infrastructure, CCTV, access control, meeting-room equipment, emergency lighting and fire-alarm provisions can also be incorporated where required.

HVAC & Workplace Comfort

HVAC requirements can be planned according to the number of offices, expected occupancy and climate at the project location.

Separate temperature-control zones can be considered for executive offices, standard office rooms and larger meeting areas where independent operation is required.

Office Furniture & Interior Options

Different furniture packages can be supplied according to the purpose of each room.

Standard offices can include desks, office chairs and visitor seating, while management rooms can be equipped with larger desks, lounge seating, storage units and additional furniture.

The executive meeting area can include conference tables, chairs, presentation equipment and storage according to the required working environment.

Customization Options

OC208 can be adapted to the organizational structure of each project.

Offices can be enlarged or combined, additional meeting rooms can be created and selected areas can be converted into open-plan offices, document-control rooms, technical rooms or storage areas.

Doors, windows, sanitary arrangements, insulation, electrical infrastructure, HVAC systems, data networks and furniture can all be customized before production.

Typical Applications

  • Major construction projects
  • EPC contractor headquarters
  • Main contractor offices
  • Infrastructure developments
  • Industrial projects
  • Mining operations
  • Oil and gas sites
  • Power and energy projects
  • Large remote project facilities

Its multi-office configuration makes OC208 especially suitable for projects requiring a centralized administration building for several departments and management levels.

Site Headquarters for Project & Accommodation Compounds

OC208 can operate as a standalone project headquarters or serve as the central administration building within a larger workforce accommodation or site compound.

Positioning project management and engineering departments close to workforce accommodation helps keep administration, site leadership and operational activities within one coordinated project environment.

Accommodation buildings, dining halls, sanitary facilities and other supporting modular buildings can also be planned within the same site infrastructure where required.

Transportation & Installation

Due to the overall size of OC208, the building is manufactured as multiple modular sections and transported to the project destination for final assembly.

Site installation generally includes positioning and structurally connecting the modules, sealing joints and completing electrical, plumbing, data and HVAC connections.

Module dimensions, lifting equipment, transportation limitations and installation sequence should be coordinated during the engineering stage.

Product Specifications

Product Large Multi-Office Administration & Management Building
Model OC208
Overall Dimensions Approximately 16.80 × 13.80 m
Building Configuration Single storey
Office Configuration Approximately 11 private offices
Management Facilities Executive office and meeting area
Circulation Central internal corridor
Sanitary Facilities Central shared sanitary block
Structure Galvanized steel modular frame
Walls & Roof Insulated sandwich-panel system
Typical Use Large project management, engineering and administration teams
Customization Available according to project requirements

OC208 Manufactured by Prefabex

OC208 is manufactured by Prefabex for major construction, EPC, infrastructure, industrial, mining, oil and gas and energy projects requiring a large centralized administration facility.

The building can be supplied as a standalone project headquarters or integrated with accommodation and supporting modular facilities within a larger site compound.

Request an OC208 Project Proposal

Send us your project location, department structure, required office capacity, management requirements and technical specifications to develop an OC208 administration building configured around your project team.

Request a Project Proposal