OC202 is a compact single-storey modular office building manufactured by Prefabex for project teams that require several private workspaces within one organized facility.
The illustrated configuration measures approximately 7.20 × 6.00 m and includes four private office rooms, central internal circulation and integrated shared sanitary facilities.
OC202 is suitable for engineers, supervisors, project managers, administrative personnel and technical staff working on construction sites, industrial projects, infrastructure developments and remote locations.
OC202 is part of the Office Containers range by Prefabex, developed for project administration, engineering and site-management requirements.
OC202 provides a practical alternative to using several separate office containers by bringing four independent workspaces together within one coordinated modular building.
This allows different project personnel or departments to work independently while remaining connected through a shared internal access area.
The illustrated OC202 layout includes four private offices arranged symmetrically around the central access area.
Each room can accommodate an individual workstation with a desk, office chair and visitor seating.
The offices can be allocated to project managers, engineers, supervisors, administrative personnel or other technical staff according to the organizational structure of the project.
Furniture layouts can also be adapted where additional workstations, filing cabinets, storage units or alternative office arrangements are required.
OC202 incorporates sanitary facilities within the central section of the building, allowing office personnel to access essential amenities without depending on a separate external sanitary unit.
The sanitary area can include a toilet, washbasin and the associated plumbing and drainage systems according to the project specification.
Fixture quantities and sanitary layout can be adapted where higher office occupancy or different project requirements apply.
A central entrance and internal circulation area connects the four private offices with the shared sanitary facilities.
This arrangement creates a clear internal organization and allows personnel and visitors to access individual offices without passing through another private workspace.
The central layout also provides a practical separation between private working rooms and common-use areas.
| Model | OC202 |
|---|---|
| Product Type | Modular office container building |
| Building Configuration | Single storey |
| Overall Dimensions | Approximately 7.20 × 6.00 m |
| Private Offices | 4 rooms |
| Circulation | Central internal access area |
| Sanitary Facilities | Integrated shared WC and washbasin area |
OC202 is well suited to small and medium project teams that require individual offices for different personnel categories or operational functions.
A typical project may allocate the four rooms to engineering, site management, administration and supervision, although the purpose of each office can be changed according to operational requirements.
The building can operate independently or form part of a larger site administration area containing meeting rooms, additional offices and supporting project facilities.
OC202 is manufactured as a purpose-built modular office rather than a converted freight container.
This allows room dimensions, doors, windows, partitions, sanitary facilities and building services to be planned specifically around workplace requirements.
Depending on the selected specification, the building can include a galvanized steel structural frame, insulated sandwich-panel walls and roof, durable flooring, internal partitions and insulated doors and windows.
Wall and roof specifications can be adapted according to the environmental conditions at the project destination.
Insulated sandwich panels can use EPS, polyurethane or rock wool cores depending on thermal, acoustic, fire-performance and project requirements.
Window specifications and HVAC provisions can also be selected for hot, cold, humid or remote-site environments.
Electrical systems can be integrated during factory production to reduce the amount of installation work required after delivery.
Typical provisions may include office lighting, sockets, switches, distribution equipment and power connections for computers and other office equipment.
Data connections, internet infrastructure, air-conditioning or heating systems, emergency lighting and fire-alarm provisions can also be incorporated according to project requirements.
Each private office can be supplied with furniture according to the required working arrangement.
Options can include work desks, office chairs, visitor seating, filing cabinets, storage units and other office furniture.
Flooring, wall finishes, lighting and furniture packages can be specified for either standard construction-site use or higher-standard administrative environments.
OC202 can be adapted according to the size, organization and operational requirements of the project team.
Internal partitions can be rearranged to create larger or smaller private offices, open-plan workspace, meeting areas or storage rooms.
Doors, windows, sanitary facilities, insulation, electrical systems, data infrastructure, HVAC equipment and furniture can all be selected according to project specifications.
OC202 can be used as an independent site office or positioned alongside accommodation buildings within a larger project compound.
This makes it possible for engineers, supervisors and administrative teams to work close to workforce accommodation and other essential site facilities.
Dining halls, sanitary buildings and other supporting modular facilities can also be coordinated within the same project layout where required.
OC202 can be manufactured as modular sections and transported to the project destination for installation on prepared foundations or supports.
Site installation generally includes module positioning, structural connections, joint sealing and final connection of electrical, plumbing and HVAC systems.
The final transportation and installation method should be selected according to transport limitations, site access and project logistics.
| Product | 4-Room Modular Office Building with Shared WC |
|---|---|
| Model | OC202 |
| Overall Dimensions | Approximately 7.20 × 6.00 m |
| Building Configuration | Single storey |
| Office Rooms | 4 private offices |
| Common Area | Central internal circulation |
| Sanitary Facilities | Integrated shared WC and washbasin area |
| Structure | Galvanized steel modular frame |
| Walls & Roof | Insulated sandwich-panel system |
| Typical Use | Site management, engineering and project administration |
| Customization | Available according to project requirements |
OC202 is manufactured by Prefabex as part of its modular office range for construction, infrastructure, industrial and remote project operations.
The building can be supplied as a standalone office facility or integrated with accommodation and other supporting buildings within a larger project site.
Send us your project location, required number of offices, expected personnel capacity and technical requirements to develop an OC202 office configuration suited to your project.
Request a Project Proposal