AC205 is a high-capacity modular accommodation building manufactured by Prefabex, designed with 18 twin-occupancy rooms, a central internal corridor and dedicated shared sanitary blocks.
The illustrated configuration measures approximately 24.00 × 13.80 m, providing around 331.2 m² of organized workforce accommodation space. With two occupants per room, the building can accommodate approximately 36 personnel.
AC205 is designed for construction camps, infrastructure projects, industrial developments, mining operations, energy projects and remote workforce locations where higher accommodation capacity is required within one coordinated modular building.
AC205 is part of the Accommodation Containers range by Prefabex, developed for workforce housing and project-site accommodation requirements.
AC205 combines 18 twin accommodation rooms with shared sanitary facilities and protected internal circulation, creating a practical layout for medium- and large-scale workforce housing projects.
Accommodation rooms are positioned along both sides of the central corridor, allowing the building to provide substantial personnel capacity while maintaining clearly separated rooms for two occupants.
The illustrated AC205 floor plan contains 18 twin-occupancy rooms arranged along the two sides of the building.
Each room is designed for two personnel, giving the building a theoretical accommodation capacity of approximately 36 occupants.
Twin-room accommodation provides greater privacy and organization than large open dormitories while maintaining efficient use of the available building area.
Each accommodation room is arranged as a practical shared living space for two project personnel.
The illustrated configuration includes two separate sleeping positions within each room together with space for personal furniture and storage.
Bed arrangements, storage, furniture packages and internal finishes can be adapted according to the required workforce accommodation standard.
AC205 uses dedicated shared sanitary blocks rather than individual bathrooms inside every accommodation room.
In the illustrated layout, sanitary facilities are concentrated at one end of the building and are arranged to serve the two accommodation wings.
The sanitary areas include multiple toilet, shower and washbasin positions, allowing a larger workforce population to be served from centralized wet-service zones.
Fixture quantities and sanitary arrangements can be adjusted according to project population, operating requirements and applicable standards.
A continuous internal corridor runs through the center of the building and provides protected access to all accommodation rooms and shared sanitary facilities.
This circulation arrangement separates the two room rows and allows personnel to move through the building without relying on external walkways.
External entrances are positioned at the ends of the building to support straightforward access and circulation.
| Model | AC205 |
|---|---|
| Building Type | High-capacity twin-room modular accommodation building |
| Building Configuration | Single storey |
| Approximate Dimensions | 24.00 × 13.80 m |
| Approximate Floor Area | 331.2 m² |
| Number of Rooms | 18 twin accommodation rooms |
| Occupancy per Room | 2 occupants |
| Potential Capacity | Approximately 36 occupants |
| Circulation | Central internal corridor |
| Sanitary Arrangement | Dedicated shared sanitary blocks |
AC205 is intended for projects where accommodation requirements exceed the capacity of smaller modular housing units.
Eighteen twin rooms allow approximately 36 personnel to be accommodated within one organized building while maintaining room-based accommodation rather than large open sleeping halls.
Several AC205 buildings can also be deployed within the same project when accommodation is required for a workforce numbering in the hundreds.
AC205 is manufactured as a purpose-built modular accommodation building rather than a converted shipping container.
This allows room dimensions, sanitary zones, internal corridors, doors, windows, partitions and building services to be developed specifically around high-capacity personnel accommodation.
AC205 can be manufactured using engineered modular steel structural frames combined with insulated wall and roof panels, internal partitions, insulated doors and windows and durable interior finishes.
Connected modular sections are engineered to operate together as one complete accommodation building after site installation.
Structural specifications can be adapted according to project location, environmental conditions and destination requirements.
Wall and roof specifications can be selected according to the climate and operating conditions at the project destination.
Insulated sandwich panels may use EPS, polyurethane or rock wool cores depending on thermal, acoustic, fire-performance and project requirements.
Doors, windows, roofing details and module connections are coordinated to create a continuous building envelope after installation.
Electrical and plumbing installations can be integrated during factory production to reduce the amount of site work required after delivery.
Electrical systems can include room and corridor lighting, power outlets, switches, distribution equipment and provisions for air-conditioning or heating.
The shared sanitary blocks allow water-supply and wastewater systems to be concentrated within dedicated wet-service zones, simplifying plumbing distribution and maintenance.
Additional systems such as emergency lighting, fire-alarm provisions, ventilation and data infrastructure can also be incorporated where required.
AC205 can be adapted according to workforce size, room standard and project requirements.
Possible changes can include bed arrangements, furniture, sanitary fixture quantities, insulation levels, flooring, windows, doors, internal finishes, electrical systems, plumbing and HVAC provisions.
Final room layouts and sanitary capacity can also be developed around the required project occupancy and applicable standards.
AC205 is manufactured as modular sections and transported to the project destination for assembly on prepared foundations or supports.
Installation typically includes module positioning, structural connections, joint sealing and final connection of electrical, water-supply, wastewater and HVAC systems.
Transportation dimensions, lifting equipment and installation sequence should be coordinated during project engineering according to the final building configuration and destination.
| Product | 18-Room Twin Accommodation Building with Shared Sanitary Blocks |
|---|---|
| Model | AC205 |
| Building Configuration | Single storey |
| Approximate Dimensions | 24.00 × 13.80 m |
| Approximate Floor Area | 331.2 m² |
| Room Configuration | Twin accommodation rooms |
| Number of Rooms | 18 |
| Occupancy per Room | 2 occupants |
| Potential Capacity | Approximately 36 occupants |
| Circulation | Central internal corridor |
| Sanitary Facilities | Dedicated shared sanitary blocks |
| Structure | Engineered modular steel frame |
| Walls & Roof | Insulated sandwich-panel system |
| Typical Use | High-capacity workforce and project accommodation |
| Customization | Available according to project requirements |
Send us your project location, required workforce capacity, room configuration, sanitary requirements and technical specifications to develop an AC205 solution suited to your project.
Request a Project Proposal